Lucy Trojan Asteroid (15094) Polymele Flyby

Flyby of the Trojan asteroid (15094) Polymele by NASA's Lucy mission. Location: (15094) Polymele.
Advertisement

Countdown Timer - Lucy Trojan Asteroid (15094) Polymele Flyby

Get ready for an exciting astronomical event as we count down to the flyby of the Trojan asteroid (15094) Polymele on Wednesday, September 15, 2027! This remarkable encounter is part of NASA's groundbreaking Lucy mission, which aims to unlock the mysteries of our solar system's formation. As the countdown timer ticks away, anticipation builds for the opportunities this flyby will provide to gather invaluable data about Polymele and its unique characteristics. Join us in following the journey, as we prepare to witness a significant moment in space exploration that promises to expand our understanding of asteroids and their role in our cosmic neighborhood. Mark your calendars and stay tuned for updates as we approach this stellar milestone!

Frequently Asked Questions

There are exactly 318 days left until Lucy Trojan Asteroid (15094) Polymele Flyby, which is 7649 hours or 458956 minutes.

Lucy Trojan Asteroid (15094) Polymele Flyby will take place on Wednesday, September 15, 2027.

Use our real-time countdown to precisely track the time remaining until Lucy Trojan Asteroid (15094) Polymele Flyby.

Click “Embed” under the countdown and copy the code or link: the Lucy Trojan Asteroid (15094) Polymele Flyby countdown widget works on any website, blog, Notion page or OBS stream, updates live and is free, with no sign-up.

There are 45 weeks and 3 days left until Lucy Trojan Asteroid (15094) Polymele Flyby.

Before Lucy Trojan Asteroid (15094) Polymele Flyby, there are 46 Sundays left, along with 45 Saturdays and 45 Fridays.

Related countdowns

See more space
Space
1

GSLV Mk II | IRNSS-1L (NVS-03)

Launch by Indian Space Research Organization. This is a replacement satellite for the Indian Regional Navigation Satellite System. The constellation will provide India with an alternative to GPS and will be used for military and civilian use. Located at a geosynchronous orbit, the system will be operated by the Indian government. From Satish Dhawan Space Centre, India.

Completed ✓
Countdown →
Space
2

RS-25 Engine Test

NASA is conducting a hot fire of an RS-25 engine as part of certification testing for future SLS (Space Launch System) rockets. The test of developmental RS-25 engine No. 10001 is planned to run for almost eight-and-a-half minutes (500 seconds) and throttle up to 111% of its rated power level. Location: Fred Haise Test Stand, NASA’s Stennis Space Center.

Completed ✓
Countdown →
Space
1

Falcon 9 Block 5 | Starlink Group 15-18

Launch by SpaceX. A batch of 27 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system. From Vandenberg SFB, CA, USA.

Completed ✓
Countdown →
Space
1

Kinetica 2 | SpaceSail Polar Group TBD?

Launch by CAS Space. Low Earth Orbit communication satellites with Ku, Q and V band payloads for the G60 constellation operated by Shanghai Spacesail Technologies with funding backed by the Shanghai local government. Initial constellation will consist of 1296 satellites by 2027 with long term plans to expand it to 12000 satellites. From Jiuquan Satellite Launch Center, People's Republic of China.

2
d
17
h
26
m
53
s
Countdown →
Space
1

Falcon 9 Block 5 | USSF-432

Launch by SpaceX. A classified mission for the United States Space Force. It is possibly a batch of classified LEO satellites based on SpaceX’s Starshield satellite bus, based on locations of rocket stage drop zones being exact fits with previous Starlink Group 15 launches. From Vandenberg SFB, CA, USA.

2
d
18
h
58
m
53
s
Countdown →
Space

US EVA-101

NASA astronaut Anil Menon and CSA astronaut Joshua Kutryk will install and deploy the eighth and final IROSA on the 3B channel of the space station, completing the power augmentation upgrades. The final two roll-out solar arrays will complete the space station’s power system augmentation. Together, the eight roll-out arrays will increase available power by up to 30%, boosting the station’s electric power generation capacity from 160 kilowatts to approximately 215 kilowatts. Location: Internat

5
d
05
h
16
m
53
s
Countdown →